St. Lucie County · Manufacturing Feedstock System Overview
Feedstock System Assessment · DOC 02 OF 06 · St. Lucie County, Florida · Feedstock Waste Study

What this document is

St. Lucie County’s existing solid waste system — volumes, routes and cost — read through to the feedstock stream Advanced Circular Manufacturing addresses.

Three things this document says
  1. ~1,100 TPD is addressable; Phase Initial at 400 TPD is ~36% of it.
  2. The verified gate rate is $79/ton, effective 1 February 2025, and rising.
  3. Cell V is being expanded at ~$30M; combustion was rejected in 2023, so redirection is the remaining lever.
Carbotura · Circular Advantage Program · Feedstock System Assessment

St. Lucie County, Florida
Feedstock System Assessment

St. Lucie County's landfill is at capacity pressure — the ACM programme converts that constraint into a 30-year royalty return

Document: Stage 1 Feedstock System Assessment Prepared for: St. Lucie County, Florida Date: May 2026 Basis: stlucieco.gov fee schedule (VERIFIED, Feb 2025); operator verification May 2026; composition and addressability ESTIMATED

Capability Finding

ACM classification determination and Regulatory Predicate Transition (RPT) status for St. Lucie County, Florida.

Regulatory Predicate Transition (RPT) — RPT

The Carbotura Advanced Circular Manufacturing (ACM) facility is classified under manufacturing NAICS codes (325180 / 325998 / 327992 / 331110 / 331314 / 331492) — not solid waste disposal codes (562213 / 562219). Both parties commit to the RPT pathway where a jurisdiction classifies the ACM facility under solid waste NAICS codes. This Regulatory Predicate Transition (RPT) must be confirmed prior to commercial terms execution.

Capability Confirmed

St. Lucie County's MSW, biosolids, and commercial residual streams are compatible with the MCR (Microwave Catalytic Reforming) process. The MCR process is anoxic and oxygen-free — not combustion. Classification under manufacturing NAICS codes applies. Subject to RPT confirmation as above.

Landfill Capacity Context

The St. Lucie County Sanitary Landfill (Permit 0126814-017-SO) is under active capacity pressure. Current cell was at 70% capacity in 2023 with originally projected 2027 runway; accelerated growth has compressed that timeline. Cell V expansion is underway at approximately $30M cost. The landfill ran at a deficit for years with rates unchanged since the 1990s — gate rates were significantly raised effective February 1, 2025. The county has cited a 5–10 year window to find alternative infrastructure. No WTE/RRF alternative exists in the county; the combustion model was explicitly considered and rejected in 2023 over air quality concerns. The ACM manufacturing pathway addresses all three constraints: capacity, cost, and classification.

Current Waste System Overview

St. Lucie County operates a county-owned disposal infrastructure under acute population growth and landfill capacity pressure.

County Population
~370K
2024 est. · Rapid growth ESTIMATED
MSW Generation
~1,100
TPD total stream (all sources) ESTIMATED
Active Landfill
331 ac
St. Lucie County Sanitary Landfill VERIFIED
WTE / RRF
None
Combustion model rejected 2023 VERIFIED

St. Lucie County is one of Florida's fastest-growing jurisdictions, anchored by the City of Port St. Lucie — one of the fastest-growing cities in the United States by percentage growth. Port St. Lucie alone added approximately 26,934 residents between 2020 and 2022. This population surge has outpaced the capacity assumptions underlying the county's existing solid waste infrastructure.

The county operates a single active Class I landfill at 6120 Glades Cut-Off Road, Fort Pierce — a 331-acre facility also housing a Baling and Recycling component. Collection in unincorporated areas is contracted to Waste Pro; Port St. Lucie is served by FCC Environmental Services. The landfill is county-owned and operated through the Solid Waste Division. No private or public waste-to-energy or refuse-derived fuel facility exists in the county.

The county's wastewater treatment function is distributed across four separate utility operators: the Fort Pierce Utilities Authority (FPUA), St. Lucie County Utilities Division, City of Port St. Lucie Utility Systems, and St. Lucie West Services District. Each generates a Class B biosolids stream that represents a secondary feedstock candidate for the ACM programme's blended organic fraction.

The Green3Power gasification agreement signed in 2015 ($175M, 1,000 TPD) never advanced to construction. As of 2023, county officials confirmed the WTE pathway was not under active pursuit, citing air quality concerns from combustion-derived ash. This regulatory environment reinforces the availability and appropriateness of the manufacturing (non-combustion, anoxic) ACM classification for St. Lucie County.

Disposal Cost Baseline — FWDC

Feedstock Waste Disposal Cost (FWDC) baseline rates, effective dates, and trajectory context for St. Lucie County.

Rate Category Per-Ton Rate Effective Date Status Source
Garbage Class 1 (MSW gate rate) $79.00/ton Feb 1, 2025 VERIFIED stlucieco.gov waste fees page
Construction & Demolition (C&D) $69.00/ton Feb 1, 2025 VERIFIED stlucieco.gov waste fees page
Yard / Land Clearing Debris $69.00/ton Feb 1, 2025 VERIFIED stlucieco.gov waste fees page
Contractor / Municipal bulk rate (prior) ~$49.00/ton Pre-Feb 2025 ESTIMATED WPTV news report, Mar 2025
Contractor / Municipal bulk rate (Oct 2025) ~$69.00/ton Oct 2025 ESTIMATED WPTV news report, Mar 2025
FWDC basis used in CSA model $79.00/ton Feb 2025 (gate) VERIFIED Conservative gate rate — see note

FWDC basis uses the verified gate rate of $79/ton (Class 1 garbage, effective Feb 1 2025). Contractor/municipal bulk rates are estimated from news sources at approximately $49/ton (pre-Feb 2025) and $69/ton (Oct 2025). CSA model uses the gate rate as a conservative, verified baseline. All rates in USD. Minimum charge: $10.00.

Rate Trajectory — Structural Acceleration

St. Lucie County's gate rates had not been meaningfully increased since the 1990s — the landfill was confirmed to be running at a deficit. The February 2025 increase to $79/ton for Class 1 garbage followed a landfill financial study. A further increase in October 2025 raised the annual residential garbage fee from $384 to $468, citing increased landfill operating costs. The Cell V expansion at approximately $30M cost will add further upward pressure on disposal rates. The Beneficiation Fee of $100/ton under the CSA replaces and exceeds the current $79/ton gate rate from Year 1; the Circular Royalty™ from Month 13 returns $120/ton — a net inversion of the disposal cost structure.

Feedstock Characterization

MSW composition and biosolids profile for St. Lucie County. Standard Florida coastal county characterization — site-specific Waste Characterization Study to follow.

Feedstock Component Est. % by Weight MCR Suitability Notes
Organic / food waste~28%YESPrimary MCR input; high carbon conversion yield
Paper and cardboard~22%YESCellulosic carbon fraction; standard MCR input
Plastic (non-PVC)~18%YESHigh energy content; PVC fraction screened out
Yard / vegetative waste~12%PARTIALComposting pathway preferred; MCR-compatible if included
Wood~6%YESCellulosic carbon fraction
Metal~5%PARTIALRecovered pre-process; residual metals extracted post-MCR
Glass~4%NOExcluded — recovered via single-stream MRF
Other / inert~5%PARTIALSite-specific screening applies

Composition based on Florida coastal county benchmarks. Subject to Waste Characterization Study (WCS) prior to CSA execution. WCS findings may adjust addressable fraction percentages. ESTIMATED

Biosolids Fraction

WWTP Operator Biosolids Class Coverage Area MCR Suitability
Fort Pierce Utilities Authority (FPUA)Class BFort Pierce + unincorporated north countyYES — 90-day blend protocol
City of Port St. Lucie Utility SystemsClass BPort St. Lucie (18 MGD capacity)YES — 90-day blend protocol
St. Lucie West Services DistrictClass BSt. Lucie West communityYES — 90-day blend protocol
St. Lucie County Utilities DivisionClass BHutchinson Island, North County service areasYES — 90-day blend protocol

All four WWTP operators confirmed as public-authority-operated generating Class B biosolids. Each biosolids stream is MCR-compatible subject to the standard 90-day blend protocol. Combined biosolids volume estimated at approximately 60–80 TPD. ESTIMATED

Seasonal Variation Note

St. Lucie County experiences elevated waste generation during the November–April tourist/seasonal resident influx (Treasure Coast winter season). MSW volumes may run 15–25% above annual average during peak season. The ACM facility CSA terms reference the annual average TPD; seasonal variation is accommodated within the 400 TPD Phase Initial specification at conservative throughput.

Feedstock Addressability Analysis

Confirmed addressable volume by stream type and phase. Phase Initial at 400 TPD represents approximately 36% of the total estimated addressable stream.

Feedstock Stream Est. TPD Addressable? Phase Notes
MSW — residential (unincorporated + cities)~660YESPhase InitialPrimary stream; Waste Pro + FCC Environmental served
MSW — commercial / C&I~280YESPhase Initial / MediumCommercial accounts at county facility gate
Biosolids — Class B (4 WWTP operators)~70YESPhase Medium90-day blend protocol; all four operators confirmed
C&D debris — non-hazardous fraction~130PARTIALPhase ExpandedNon-hazardous, non-inert fractions only; WCS required
Yard / vegetative waste~100NOComposting pathway preferred; county policy
Household hazardous wastetraceNOExcluded per MCR hazardous material protocols
Total Addressable Stream~1,010–1,200YESPhases I–IIIPhase Initial 400 TPD = ~36% of addressable volume

All TPD figures are ESTIMATED from county-level population and waste generation benchmarks. Phase Initial (400 TPD) draws from MSW residential and commercial streams only. Site-specific Waste Characterization Study required prior to CSA execution. ESTIMATED

Phase Deployment Schedule

Phase TPD Annual TPY Year 1 Fee Year 2 Royalty Royalty Surplus Yr 2 Timeline
Phase Initial400146,000$14.60M$17.52M+$2.56MT₀ + 24 mo
Phase Medium800292,000$29.20M$35.04M+$5.11MT₀ + 42 mo
Phase Expanded1,200438,000$43.80M$52.56M+$7.67MT₀ + 60 mo

Beneficiation Fee: $100/ton · 2.5%/yr escalator. Circular Royalty™ (Year n) = (120% + (n−1)pp) × that year’s Beneficiation Fee. Royalty Surplus = Royalty Year 2 − Fee Year 2 (escalated). Royalty payments begin 13 months after corresponding fee payments. Gross cost displacement shown separately in Proposal document per the Separate Transaction Principle. Timeline from T₀ = contract execution. ESTIMATED

Feedstock Infrastructure Map

Feedstock Infrastructure Map

Active disposal facilities, transfer stations, WWTPs, and MRF/recycling infrastructure across St. Lucie County, FL.

Map requires a Google Maps API key.
Set GOOGLE_MAPS_API_KEY in config.js.

St. Lucie County Sanitary Landfill
6120 Glades Cut-Off Rd, Fort Pierce, FL 34981
Active Landfill Exogenesis™ Candidate
331-acre county-operated facility · FDEP Permit 0126814-017-SO · Cell V expansion underway · Primary MSW disposal site · Landfill ran at deficit; rates raised Feb 2025
WM Fort Pierce Transfer Station
3890 Selvitz Rd, Fort Pierce, FL 34981
Transfer Station
Waste Management operated · Commercial transfer station serving St. Lucie County waste streams
FPUA Water Reclamation Facility
403 Seaway Dr, Fort Pierce, FL 34949
WWTP
Fort Pierce Utilities Authority (FPUA) · Serves Fort Pierce + unincorporated north county · Class B biosolids feedstock candidate
Port St. Lucie Utility Systems
121 SW Port St Lucie Blvd, Port St. Lucie, FL 34984
WWTP
City of Port St. Lucie · 18 MGD combined treatment capacity · Biosolids feedstock candidate
St. Lucie West Services District WWTP
450 SW Utility Dr, Port St. Lucie, FL 34986
WWTP
St. Lucie West Services District · Serves St. Lucie West community · Biosolids feedstock candidate
Recycling Services of Florida (RSF)
4205 Metzger Rd, Fort Pierce, FL 34947
MRF
Material recovery facility · Fort Pierce area · Single-stream recyclables processing
Port St. Lucie Recycling Inc.
1145 SW Biltmore St, Port St. Lucie, FL 34983
MRF / Scrap
Scrap metal and materials recovery · Port St. Lucie service area
Biowaste LLC
1408 NW Commerce Centre Dr, Port St. Lucie, FL 34986
Biosolids
Biosolids and organic waste processing facility · Secondary feedstock candidate
St. Lucie County Airport Landfill (Closed)
Near Treasure Coast Intl Airport, Fort Pierce, FL (approx.)
Closed · EPA Superfund
Closed / Remediated · EPA National Priorities List Site #0404308 · Long-term care ongoing · Location approximate PROVISIONAL
Active landfill
Transfer station
WWTP / Water reclamation
MRF / Recycling / Biosolids
Historical / Closed

Basis of Presentation — Confidence Taxonomy

Basis of Presentation — Confidence Taxonomy

LOCKED
Architect-specified. Not subject to site-level verification. TMC Fee $100/ton, phase TPD targets, CSA commercial terms.
VERIFIED
Sourced from public government records, county websites, or FDEP databases. FWDC gate rate $79/ton, landfill address, operator names.
ESTIMATED
Derived from industry benchmarks, news reports, or population-based modelling. Population, MSW TPD, contractor bulk rates, feedstock composition.
PROVISIONAL
Working assumption subject to site-specific study or operator confirmation. Airport Landfill coordinates, site candidate locations.

Verified sources: stlucieco.gov/departments-and-services/solid-waste/waste-fees (waste fees, Feb 1 2025); wflx.com/2025/03/12 (landfill capacity and rate trajectory); wptv.com/news/treasure-coast/region-st-lucie-county (population and landfill capacity); cumulis.epa.gov/supercpad (Airport Landfill Superfund). Verification date: May 2026.

Was this feedstock system assessment useful?
Indicative reference only — not an offer. All financial figures are Carbotura planning-basis estimates unless marked VERIFIED. The $79/ton FWDC is verified from stlucieco.gov (Class 1 gate rate, effective 1 February 2025). The Beneficiation Fee of $100/ton and all royalty figures are ESTIMATED on Carbotura standard parameters and are subject to Term Sheet confirmation. Employment figures are scaled from standard manufacturing parameters. Exogenesis™ candidacy is subject to feedstock characterisation. Pricing is available under a Circular Supply Agreement (CSA) or a Circular Materials Offtake Agreement (CMOA) — contact Carbotura.